Partially renovated timber deck with support posts and window

Patio Decking Perth

Alfresco Decks That Actually Work

Flush Thresholds Door to deck — seamless.
Roof Integration Fits existing patios.
Built Properly Ground clearance correct.

Proper flush thresholds. Low-profile frames that fit under existing roofs. No trip hazards, no wasted height, no callbacks.

Max. file size: 5 MB.
Attach a photo or document of your job. Max file size 5 MB.

★★★★★
All was done professionally with no hick ups. We can highly recommend Breezebay Carpentry.

Vicky Poelman

Perth Homeowner

★★★★★
He has given me a quote for the work to be done which worked out to be a very competitive price.

Wayne Jermy

Google Review

★★★★★
He was also respectful and straight talking - not a creepy tradie trying to fleece you or talk bulls*it.

Victoria Jones

Google Review

★★★★★
Both jobs were done to an exceptional standard, competitive price and completed in a timely manner.

Nancy De Pinto

Google Review

★★★★★
....keeping the site safe and very clean he has been an absolute pleasure to work with.

Juliette Grey

Google Review

★★★★★
It was a tricky job, involving a bit of creativity, but a year on they look great.

Ian Pawley

Google Review

★★★★★
Andrew did a fantastic job, and a very competitive price.

Ash Low

Google Review

★★★★★
Work has been completed on time, to a high standard and at reasonable cost.

Roger Palmer

Google Review

Covered timber deck patio in suburban backyard
Covered timber deck patio in suburban backyard

Why Most Alfresco Decks Get Built Wrong

The most common failure with patio decking isn’t structural — it’s height. The deck ends up 20–30 mm above the interior floor threshold. You trip over it with drinks. You scrape furniture legs. The door sweep doesn’t seal. Rain tracks in.

Then there’s the roof problem. An existing patio or pergola roof limits how high you can build. If the carpenter hasn’t worked out the bearing loads and subframe depth properly, you either hit the roof lining or you’ve got a deck that’s too low — which traps water under the boards and breeds termites within three years.

This is the difference between someone who quotes alfresco work and someone who’s built dozens under roofed areas in Perth. The job needs precision at every layer: slab prep, joist sizing for load without excess height, fastening that won’t lift when the summer expansion hits, and drainage that doesn’t back up under the deck.

Proper decking installation here means working backwards from the threshold before you sink the first post.

Covered timber deck with steps and potted plants

What Alfresco Patio Decking Actually Covers

A proper alfresco deck build isn’t just boards on bearers. It’s engineered from the threshold back — flush transitions, roof-integrated heights, and load-bearing frames that don’t sag when twenty people stand on it with a barbecue.

Flush Threshold Connection

The deck surface finishes at the exact height of your interior floor — within 2 mm tolerance. No lip, no step, no gap for weather to get through. This means calculating joist depth, board thickness, and finished surface plane before the first bearer goes down.

Low-Profile Subframe for Roofed Areas

When you’re building under an existing patio roof or pergola, frame depth matters. A standard 190 mm joist won’t fit. We use engineered LVL bearers at 90–140 mm depths depending on span and load — high enough for proper ground clearance, low enough to stay under the roof lining without compromising strength.

Integrated Roof and Pergola Structures

If the deck will carry a new pergola or attach to an existing roof structure, the posts, ledger boards, and tie-downs are part of the deck scope. This isn’t two separate jobs bolted together — it’s one engineered frame. Post positions are locked in at the start so board runs don’t end up interrupted by a pergola post three-quarters of the way across.

Ground Clearance and Airflow

Minimum 150 mm clearance from ground level to underside of joists — more in high-moisture or termite-prone areas like coastal Perth. Proper ventilation keeps the timber dry and stops rot forming under the deck. We check drainage slope before pouring pads so water doesn’t pool beneath the boards.

Outdoor Kitchen and Appliance Integration

If you’re planning a built-in barbecue, pizza oven, or sink on the deck, the frame needs reinforcement under those zones. Gas and water lines run under the deck to service points, so joist spacing and trapdoor access are planned at the start — not hacked in later.

Timber backyard deck with covered pergola and plants

Timber vs Composite for Alfresco Decks

Most alfresco areas use either hardwood timber or composite decking. Both work under a roof — the key difference is maintenance load and upfront cost.

Hardwood Timber (Merbau, Spotted Gum)

Upfront cost: $200–$350/m² installed. Requires annual oiling or six-monthly in coastal zones. Expands and contracts with moisture, so gapping needs to be precise (4–6 mm). Splinters if left untreated. Weathers to silver-grey if you skip oiling. Lasts 20+ years with proper maintenance. Feels natural underfoot and stays cooler than composite in Perth summer sun.

Composite Decking

Upfront cost: $280–$450/m² installed. No oiling required — wash down twice a year. Doesn’t splinter. Expands more than timber (10–15 mm gapping on long runs), so breaker boards are mandatory. Some brands fade or chalk after 5–7 years in direct sun. Warranties vary — read the fine print on UV and fade claims. Good for high-traffic areas where you don’t want ongoing maintenance, but gets hotter underfoot than timber.

For covered alfresco areas where UV exposure is reduced, composite performs better long-term because the roof protects it from direct sun degradation. If you want natural timber warmth and are fine with annual maintenance, hardwood is the better pick. Read more on timber vs composite decking trade-offs.

Covered wooden backyard deck with brick paving

Perth Alfresco Deck Considerations

Perth’s coastal wind, sandy soil, and summer heat create specific challenges for alfresco decks that don’t exist inland or in cooler climates.

Coastal Wind Loading (Within 5 km of Coast)

From Fremantle south to Secret Harbour, wind classifications require engineered tie-downs and heavier fastening schedules. A standard deck in Armadale might use 75 mm coach screws every 600 mm on the ledger — a coastal deck needs 90 mm screws at 450 mm spacing plus cyclone ties on the bearers. Your engineer’s certification will specify this; council won’t pass the job without it.

Limestone and Sandy Soil Movement

Most of Perth’s southern suburbs sit on limestone or Bassendean sand — both prone to movement when moisture levels change. Concrete piers for deck posts need to be deeper than the standard 600 mm footing you’d use in clay zones. We go 900 mm minimum, wider diameter, and check for voids in the limestone before pouring. A deck that settles 15 mm over three years pulls the ledger away from the house and cracks render.

Summer Heat and Board Expansion

A 6-metre composite board can expand 12–15 mm between a 10°C winter morning and a 42°C January afternoon. If the gapping isn’t correct at installation (we typically install in moderate temps — 18–22°C — and allow 8–10 mm end gaps), the boards buckle or lift the fasteners. Hardwood expands less (4–6 mm over the same span) but still needs proper gapping to avoid cupping.

Termite Protection in Garden-Adjacent Decks

If the deck abuts garden beds or lawn, there’s a termite entry risk where soil meets timber. We use either a physical stainless-steel mesh barrier under the deck perimeter or a treated pine subframe with chemical barrier at the soil line. Hardwood decking boards are termite-resistant, but the frame (usually treated pine H4) is the vulnerable zone. Annual inspections under the deck are part of the deal — skipping them voids most pest warranties.

Covered timber deck with garden and pergola roof

Why a Carpenter vs a Decking-Only Contractor

A decking specialist can lay boards fast. A qualified carpenter runs the full build — ledger attachment to the house frame, roof integration, door threshold adjustments, balustrade fixing, and electrical conduit placement if you’re adding outdoor lighting or ceiling fans.

The decking contractor quotes the deck. Then you get a separate quote for the electrician to run cables, another for the glazier to supply the balustrade panels, another for someone to notch the door frame so it clears the new deck height. Five invoices, five timelines, five people pointing at each other when something doesn’t line up.

A carpenter coordinates the full scope. The balustrade posts are built into the frame at the right centres for the glass panels. The electrician’s conduit runs are planned before the joists go down. The door threshold is shimmed or trimmed so it seals properly against the finished deck. One person is responsible for the whole installation — not just the visible part.

For alfresco areas where the deck integrates with roofing, doors, and outdoor services, this coordination is the difference between a finished zone that works and a half-done project where you’re still chasing trades six months later. Read the full breakdown on DIY vs professional decking installation.

alfresco deck building phase

A Typical Alfresco Deck Build Process

Proper patio decking installation follows a locked sequence. Skip a step or reverse the order and the job won’t pass inspection — or worse, fails structurally two years in.

  1. Site measure and engineering (Week 0) — We measure the existing slab or ground level, mark out the deck perimeter, and check threshold heights at every door that’ll open onto the deck. If council approval or engineering is required (decks over 1 m high, or within 1 m of a boundary), that’s organised now. Engineering takes 1–2 weeks to come back.
  2. Ground prep and footing installation (Day 1–2) — Excavate for concrete piers or pads (900 mm deep for coastal zones, 600 mm inland). Pour and cure. In sandy soil, we use wider diameter footings to spread the load. Wait 3–7 days for concrete to cure before loading.
  3. Ledger and bearer installation (Day 3–4) — Fix the ledger board to the house frame with coach screws or dynabolts into brick. Install bearers on the piers at calculated centres (450 mm for composite, 600 mm for hardwood). Check level across the full frame — any bow here creates a wavy deck surface.
  4. Joist and blocking installation (Day 4–5) — Joists run perpendicular to the decking boards. Blocking between joists stops lateral movement and stiffens the frame. If you’re integrating pergola posts, they’re fixed now before boards go down.
  5. Board installation (Day 5–7) — Lay boards with correct end gapping (8–10 mm for composite, 4–6 mm for timber). Hidden fasteners or face screws depending on board type. Start from the house and work out so the final cut edge is at the perimeter where it’s less visible.
  6. Fascia, trim, and balustrade (Day 7–8) — Fascia boards cover the cut ends of the deck boards. Balustrade posts are bolted through the frame (not just screwed to the fascia — that’s a fail). Glass or timber infill panels go in last.
  7. Final threshold adjustment and sealing (Day 8) — Door thresholds are shimmed or trimmed so they sit flush with the deck. Weather seals are fitted. The deck is cleaned and any protective coatings (oil for timber, or anti-slip treatment) are applied.

Total build time for a standard 25–40 m² alfresco deck: 8–10 working days assuming no weather delays and materials arrive on time. Larger decks or complex roof integrations add 3–5 days.

Covered timber deck overlooking sunny backyard garden

Indicative Alfresco Deck Costs

Pricing depends on material choice, deck size, site access, and how much integration work is required (roof attachment, threshold modification, balustrade). These are Perth metro indicative rates as of 2026.

Hardwood Timber Alfresco Deck

  • Material + installation: $220–$350/m² for Merbau or Spotted Gum boards on treated pine H4 frame.
  • 25 m² deck: $5,500–$8,750 total.
  • 40 m² deck: $8,800–$14,000 total.
  • Add $1,200–$2,000 for glass balustrade (1.2 m high, frameless). Add $800–$1,500 for timber balustrade.
  • Add $600–$1,200 for ledger flashing and threshold modifications if existing door sills need adjustment.

Composite Alfresco Deck

  • Material + installation: $300–$480/m² for mid-tier composite (Trex, NewTechWood equivalent) on aluminium or treated pine subframe.
  • 25 m²: $7,500–$12,000 total.
  • 40 m²: $12,000–$19,200 total.
  • Balustrade and threshold costs same as timber.

What Drives the High End

  • Roof integration: If posts need to tie into an existing patio roof structure, engineering and tie-down work add $800–$1,500.
  • Difficult access: If materials need to be hand-carried through a side gate with no machinery access, labour time increases by 15–25%.
  • Height above ground: Decks over 1 m high require engineered balustrades and deeper footings — add 10–20% to the base cost.
  • Electrical and plumbing rough-in: Running conduit for outdoor lights or water supply for a sink adds $600–$1,200 depending on run length.

These are supply + install rates. DIY material-only pricing is roughly 40–50% of the installed cost if you’re doing the labour yourself — but you’ll need tools, a trailer, and the time to work through the engineering and council approval process.

Why Choose Breezebay for Your Alfresco Deck

We're not a franchise crew or a decking-only installer. Andrew is a qualified carpenter — which means the full build is handled properly from ledger to balustrade.

30+ Years Experience

Built hundreds of decks across Perth’s coastal and inland zones. We know what works and what fails.

Qualified Carpenter

Not a handyman or deck-only contractor. Full trade ticket, Licensed Builder WA 9005265.

Professional Finish

Flush thresholds, proper gapping, no callbacks. Work we’d be comfortable showing in daylight.

Upfront Pricing

Fixed quote before work starts. No surprises, no variation creep halfway through the job.

Timber deck patio with potted plants and brick wall

Is Alfresco Decking Right for You?

An alfresco deck makes sense if you’re trying to extend usable living space outdoors and create a seamless transition from inside. It’s the right solution when:

  • You’ve got an existing patio roof or pergola and want to upgrade from concrete or pavers to a timber or composite surface.
  • You’re building a new alfresco entertainment area and need the deck integrated with the roofing structure from the start.
  • Your back door threshold is currently a step down to ground level and you want a flush connection for furniture movement and accessibility.
  • You’re planning an outdoor kitchen or built-in barbecue and need a level, stable platform that can handle point loads.
  • You want a low-maintenance outdoor surface that’s easier on bare feet than pavers and doesn’t crack or stain like concrete.

It’s not the right solution if your site has major drainage issues (pooling water, no fall away from the house) that need fixing first — a deck built over boggy ground will rot out within five years. It’s also not the cheapest option if you’re just after a flat outdoor surface with no roof integration — in that case, a simple ground-level deck or paving might be more cost-effective.

If you’re unsure whether the site is suitable or what material will work best for your usage, that’s what the site consultation is for. We measure, check levels and drainage, and give you an honest answer on what’ll work long-term — not just what’s easiest to quote.

Alfresco Deck FAQs

We work backwards from the finished floor height. Measure the exact threshold level, subtract the board thickness, then calculate the joist depth and bearer height to land at that target. The ledger board fixes to the house frame at a precise height — usually we shim it with packer plates to get within 2 mm tolerance. Door sweeps are adjusted or replaced if needed so they seal against the new deck surface. If the existing floor is too low to achieve proper ground clearance under the deck, we’ll flag that at the site measure — sometimes the threshold needs to be raised slightly or a small step is unavoidable.

Yes, that’s one of the most common alfresco deck scenarios. The challenge is keeping the finished deck height low enough to maintain headroom under the roof lining while still achieving minimum 150 mm ground clearance for airflow. We use engineered LVL bearers at 90–140 mm depths instead of standard 190 mm joists. The exact depth depends on the deck span and load — a 4-metre span with no mid-support needs deeper bearers than a 2.5-metre span with a central post. If the patio roof is sagging or the lining is already low, we’ll measure the headroom before quoting — sometimes the roof structure needs adjustment before the deck can go in.

In Perth metro, council approval depends on height and setback. Decks under 500 mm high from natural ground level and more than 1 metre from any boundary are usually exempt. Anything over 500 mm high or within 1 metre of a boundary needs a building permit and engineering certification. If you’re adding a new patio roof at the same time, that almost always requires approval regardless of height. Coastal wind zones (C or D classification) require engineering even for low decks. We handle the paperwork and liaise with the engineer if approval is needed — it adds 2–3 weeks to the start timeline but keeps the job compliant.

Alfresco decking is designed to integrate with an existing or planned patio roof structure, connect flush with interior door thresholds, and often support outdoor kitchens or entertainment fixtures. Standard decks are typically freestanding or elevated platforms with no roof attachment. The framing for an alfresco deck needs to account for roof load transfer if posts are shared, and the height tolerances are tighter because you’re matching interior floor levels. Material choice is similar — timber or composite — but the installation complexity is higher for alfresco work.

Indicative installed costs (material + labour): hardwood timber decks run $220–$350/m², composite decks $300–$480/m². For a typical 30 m² alfresco area, expect $6,600–$10,500 for timber or $9,000–$14,400 for composite. Add $1,200–$2,000 for glass balustrade, $800–$1,500 for timber balustrade, and $600–$1,200 for threshold adjustments and ledger flashing. Larger decks with complex roof integration, electrical rough-in, or difficult site access push costs toward the high end. These are Perth metro rates as of 2026 — coastal zones sometimes add 10% for additional tie-down engineering.

Yes, but the frame needs reinforcement under any fixed appliance zones — barbecues, pizza ovens, sinks. We typically double the joists and add blocking under these point loads. Gas and water lines run under the deck to service points, so we plan access hatches or trapdoors at the design stage. Electrical conduit for power outlets and lighting is also roughed in before boards go down. If you’re planning built-in cabinetry or benches, those post positions are locked in early so the deck board layout doesn’t end up interrupted halfway across.

For a standard 25–40 m² alfresco deck with roof integration and balustrade, allow 8–12 working days from start to finish. That assumes materials arrive on time, no weather delays, and council approval (if required) is already sorted. Site prep and footings take 2–3 days including concrete cure time. Frame and joist installation takes 2–3 days. Board laying and trim takes 3–4 days. Final balustrade and threshold adjustments take 1–2 days. Complex jobs with outdoor kitchen rough-in, custom thresholds, or difficult access can add 3–5 days. We give a realistic timeline at the quote stage based on your specific site.

Composite decking gets hotter than timber — some brands reach 60–70°C surface temp in direct sun. Under a patio roof, the temperature is lower because the roof shades the deck. Hardwood timber (Merbau, Spotted Gum) stays 10–15°C cooler than composite in full sun. If you’re building in an area with no roof cover and plan to walk barefoot regularly, timber is the better choice. For covered alfresco areas, composite heat isn’t usually an issue because the roof blocks most direct UV.

Ready for a Proper Alfresco Deck?

Ready for a Proper Alfresco Deck?

Tell us what you're working with. We'll measure, quote, and tell you what's realistic — no wasted height, no trip hazards, no shortcuts.