Creating a Dust Proof Attic Storage Room
How to create a sealed, dust-proof roof storage…
May 18, 2026
Slip-resistant surfaces. Materials that laugh at chlorine. Drainage that works. Built by a carpenter who’s watched tradies bodge this for 30 years.

Most pool decks are built by people who’ve never fallen on one. The plumber lays pipes. The tiler finishes the coping. Then someone who doesn’t understand water flow slaps down whatever decking boards Bunnings had on special.
Six months later, you’ve got puddles that don’t drain, boards warping in the sun, and a surface so slippery when wet you’re genuinely scared your kids will crack their heads open.
A proper pool deck isn’t just boards screwed down tight.
It’s a system — slip-resistant surface rated for wet areas, subframe materials that won’t rot under constant splash, drainage grates positioned so water actually goes somewhere, and fasteners that won’t corrode the first time chlorinated water hits them.
We’ve built decking around pools in Rockingham, Mandurah, and up to Perth’s northern suburbs. The ones done right are still solid a decade later. The bodge jobs start falling apart in year two.

Every second pool deck we quote has a surface that’s genuinely dangerous when wet. Smooth composite with no texture. Polished hardwood sealed for looks, not grip. Tiles that belong inside, not next to a body of water.
Australian Standards specify wet-area slip resistance as R11 minimum for pool surrounds. That’s not a suggestion. It’s the rating that prevents hospital visits.
R11 means the surface has enough texture and grip to handle barefoot traffic when saturated. Most off-the-shelf composite decking sits at R10 — fine for a dry patio, useless around a pool.
We only use materials rated R11 or higher for pool surrounds. The boards cost more. The surface isn’t Instagram-smooth. But they work.
If you’re getting quoted composite decking for around your pool and the tradie can’t tell you the slip rating, walk away. They’re guessing.
These aren't optional extras. They're the basics every pool surround needs to survive more than five years.
Standard treated pine rots under constant chlorine splash. Pool-grade materials — certain composites, marine-spec hardwoods — shrug it off.
Grates positioned where water actually pools. Falls graded so puddles drain, not sit. Subframe spaced for airflow so timber underneath doesn’t rot.
WA pool fencing regulations dictate deck height boundaries. Built wrong, your deck becomes a climbable surface and fails inspection.
Hardwood or treated-to-H4 joists. Stainless fixings. Galvanised brackets. The stuff under the deck dictates whether it lasts 8 years or 25.
Perth summer hits 40°C. Boards expand. Fasteners loosen. We gap for thermal movement and use UV-stable materials that don’t fade to grey in two seasons.
Tell us what you’re working with. We’ll tell you what’ll actually work.

Most pool-safe option. Won’t rot, fade, or splinter. Stays cooler underfoot than standard composite. Costs $180–$240/m² installed. Lifespan 25+ years with zero maintenance beyond hosing off.
Natural look, genuine grip when textured correctly. Needs annual oiling to prevent greying. Costs $150–$200/m² installed. Lifespan 20+ years if maintained. Goes slippery when sealed smooth — we leave it textured.
Cheapest option at $90–$130/m² installed. Prone to warping in wet conditions. Needs re-oiling every 12–18 months. Lifespan 10–15 years. Only worth considering if budget’s genuinely tight and you’re prepared to maintain it.
What we actually recommend: Premium composite for zero-fuss longevity. Marine hardwood if you want the natural look and don’t mind the upkeep.

Perth’s climate and soil do things to pool decks that don’t happen in Melbourne or Sydney.
Reactive clay soil movement. Most of Perth’s southern suburbs sit on reactive clay. Wet season expands the soil. Summer shrinks it. Deck footings move. We use adjustable post bases on sand-stabilised pads, not poured-and-pray concrete piers.
Salt air corrosion (Rockingham, Mandurah, coastal suburbs). Standard galvanised fixings rust out in 5–8 years near the coast. We use marine-grade stainless for any job within 5km of the beach. Costs 40% more. Lasts 4x longer.
40°C+ summer days. Composite decking expands 6–8mm per linear metre at peak heat. Gap the boards wrong and they buckle. We set gaps at 8mm minimum and use breaker boards on long runs.
Council pool fencing inspections. If your deck sits higher than 1200mm from natural ground level at any point and abuts the pool fence, you’ve created a climbable zone. Inspector fails it, you rip it out. We design deck heights to stay compliant before we start building.

You can. They’ll quote you, book you in, and show up with a labourer who’s built three decks in his life.
Here’s what a decking specialist doesn’t do: spot that your pool’s backfill has settled unevenly and the deck’s going to crack the coping in six months. Notice that the existing drainage grate’s in the wrong spot and you’ll have a permanent puddle. Understand that your pool fence sits 50mm too close to where the deck edge needs to land and the whole layout has to shift.
A carpenter who’s spent 30 years on job sites picks that up in the first five minutes. We don’t just screw boards down. We work out what’s going to go wrong before it does.
The decking specialist will give you exactly what you asked for. We’ll tell you if what you asked for won’t work — and what will.

Day 1–2: Site prep and footings. Mark out deck boundaries relative to pool fence compliance zones. Dig footing positions on sand-stabilised pads (not raw clay). Install adjustable post bases. Set datum levels for drainage falls.
Day 3–5: Subframe construction. H4-treated or hardwood joists at 450mm centres for composite, 400mm for timber. Stainless coach screws on coastal jobs, galvanised inland. Install drainage grates where water naturally pools. Leave 100mm minimum clearance under joists for airflow.
Day 6–8: Decking board installation. Lay boards with 8mm thermal expansion gaps. Use hidden fasteners on grooved composite or stainless screws countersunk on hardwood. Install breaker boards every 5 linear metres on long runs. Finish fascia and edge trim.
Day 9: Final checks and sign-off. Test slip resistance when wet. Verify all drainage flows away from pool. Check fence compliance sightlines. Hand over with material spec sheet and maintenance guide.
Typical build time: 7–10 working days for a 40–60m² pool surround, weather dependent.
Prices below are supply + install for Perth metro, indicative only. Actual cost depends on site access, ground conditions, existing pool fence configuration, and material selection.
$180–$240/m² for R11-rated composite boards, marine-grade subframe, stainless fixings, drainage grates included. Example: 50m² surround = $9,000–$12,000.
$150–$200/m² for Merbau or Spotted Gum, H4-treated subframe, stainless screws, textured finish (not sealed smooth). Example: 50m² surround = $7,500–$10,000.
$90–$130/m² for H4 pine, galvanised fixings (stainless upgrade adds $15/m²). Shorter lifespan, higher maintenance. Example: 50m² surround = $4,500–$6,500.
Most pool deck quotes you’ll get are for the boards only. Ours include subframe spec, drainage solution, and compliance with WA pool fencing regs — because a deck that fails inspection costs more to fix than it did to build.

You’ve just had a pool installed and the area around it is bare concrete or compacted sand. You want somewhere to walk that won’t turn into a mud pit in winter or a heat trap in summer.
Your existing pool deck is falling apart. Boards are warped, splinters everywhere, puddles that don’t drain, or the surface has gone so slippery you’re genuinely scared someone’s going to get hurt.
You’re renovating the backyard and the pool’s the centrepiece. The deck’s the thing that makes it usable — somewhere to put the outdoor furniture, the BBQ, the lounges. Done properly, it’s the difference between a pool you actually use and one that sits there looking expensive.
You live in a coastal suburb (Rockingham, Mandurah, Safety Bay) and standard timber’s rotting faster than you expected. Salt air eats cheap materials. You need something that’ll last.
A pool deck isn’t a nice-to-have. It’s the safety surface around a body of water your kids run near. Get it wrong and someone ends up in hospital. Get it right and it’s still solid in 20 years.
Australian Standards specify R11 minimum for wet areas including pool surrounds. That’s the rating that provides adequate grip when saturated. Most standard composite decking sits at R10 — fine for dry patios, not safe around pools. We only use R11+ rated materials for pool decks. If a tradie quotes you decking and can’t tell you the slip rating, they’re guessing.
Three things: H4-treated or hardwood joists (not H3 structural pine), 100mm minimum ground clearance for airflow, and positioning the subframe so water drains away from posts and beams. Standard framing-grade pine rots out in 5–8 years under a pool deck. H4 or hardwood lasts 20+. We also use stainless fixings on coastal jobs because galvanised corrodes faster near salt air.
Depends whether it’s been designed with compliance in mind. If your deck sits higher than 1200mm from natural ground level at any point and abuts the pool fence, you’ve created a climbable zone under WA pool barrier regs. Inspector fails it, you rip it out. We design deck heights and fence setbacks to stay compliant before we start building. That’s the advantage of working with someone who understands the regs, not just the carpentry.
Indicative pricing for supply + install: Premium composite (R11-rated, chlorine-proof) runs $180–$240/m². Marine hardwood (Merbau, Spotted Gum, textured finish) is $150–$200/m². Treated pine (H4 minimum) is $90–$130/m² but needs annual maintenance and has a shorter lifespan. A typical 50m² pool surround in premium composite sits around $9,000–$12,000 including subframe, drainage, and stainless fixings if you’re coastal.
7–10 working days for a 40–60m² surround, weather dependent. Day 1–2 is site prep and footings. Day 3–5 is subframe construction with drainage grates installed. Day 6–8 is board installation and fascia trim. Day 9 is final checks and sign-off. Bigger decks with multiple level changes or integrated stairs take longer. We don’t book back-to-back jobs so we’re not rushing yours to get to the next one.
Standard first-generation composite can hit 60–70°C in direct Perth summer sun. Premium pool-rated composite with heat-reflective pigments stays 10–15°C cooler. Still warmer than hardwood, but not barefoot-burning. If heat’s a genuine concern, marine hardwood with a textured (unsealed) finish stays coolest. We test surface temps on material samples before recommending them for full-sun pool surrounds.
Pool decking needs R11+ slip resistance (regular decking is often R10), chlorine and saltwater-resistant materials (standard treated pine degrades faster), rot-proof subframes because of constant splash, drainage grates positioned where water pools, and compliance with pool fencing height regulations. Regular decking doesn’t deal with any of that. The materials cost more, the labour’s more technical, and the consequences of getting it wrong are higher — it’s a safety surface around water.
Yes, if the concrete’s sound and has adequate drainage. We use adjustable pedestals or treated sleepers to create the subframe above the slab. The deck sits 50–80mm above the concrete, allowing airflow underneath. Key constraint: existing slope — if the concrete doesn’t drain properly, neither will the deck on top. We assess the slab before quoting because some concrete surrounds need fixing before you can deck over them.