Partially renovated timber deck with support posts and window

Timber Decking Installation Perth

The Authentic Deck Timber Delivers

Authentic Grain Natural textures.
Bushfire Rated BAL options.
Carpenter Finish Hand-crafted.

No plastic pretending to be wood. Real hardwood boards, hand-selected, properly fixed with stainless steel, and built to handle Perth summers without warping. The deck traditional renovators still prefer.

Max. file size: 5 MB.
Attach a photo or document of your job. Max file size 5 MB.

★★★★★
All was done professionally with no hick ups. We can highly recommend Breezebay Carpentry.

Vicky Poelman

Perth Homeowner

★★★★★
He has given me a quote for the work to be done which worked out to be a very competitive price.

Wayne Jermy

Google Review

★★★★★
He was also respectful and straight talking - not a creepy tradie trying to fleece you or talk bulls*it.

Victoria Jones

Google Review

★★★★★
Both jobs were done to an exceptional standard, competitive price and completed in a timely manner.

Nancy De Pinto

Google Review

★★★★★
....keeping the site safe and very clean he has been an absolute pleasure to work with.

Juliette Grey

Google Review

★★★★★
It was a tricky job, involving a bit of creativity, but a year on they look great.

Ian Pawley

Google Review

★★★★★
Andrew did a fantastic job, and a very competitive price.

Ash Low

Google Review

★★★★★
Work has been completed on time, to a high standard and at reasonable cost.

Roger Palmer

Google Review

home extension with timber decking, dawesville

Why Property Investors Choose Timber Decking

When you’re renovating to sell or adding value to a rental, the deck finish sends a message about the quality of the rest of the property. Investors picking timber over composite usually know their buyer demographic — families who notice authentic materials, or regional markets where timber is still the expected standard.

Hardwood decking like Merbau and Spotted Gum delivers authentic grain textures that can’t be replicated by composites. There’s no plastic feel underfoot, no uniform repeat pattern across the boards. Each plank shows its natural character, and buyers who care about that detail recognise the difference immediately.

For bushfire-prone suburbs, Merbau has a BAL-12.5 rating and naturally resists termites — two fewer things to explain to a building inspector or a cautious buyer. Treated pine offers a cost-effective deck solution when the budget is tight but the finish still needs to photograph well.

The carpenter-built advantage? Every board is checked by hand before it’s fixed. Warped lengths get rejected on-site, not discovered six months later when the tenant complains. Stainless steel screws go in at the right spacing, not wherever looks convenient. It’s the finish you’d build for your own home — which is exactly what an investor property needs if it’s going to stand out in a crowded rental or resale market.

timber pergola post installation, secret harbour

Timber Species Compared

Merbau (Red Hardwood)

Best for: High-traffic outdoor areas, bushfire zones, investment properties targeting premium buyers.
Durability: Class 1 hardwood, naturally resistant to termites and decay. Expected lifespan 40+ years with minimal maintenance.
BAL rating: BAL-12.5 compliant without additional treatment.
Appearance: Rich red-brown tones that darken to deep chocolate over time. Distinct grain with natural oil content that repels moisture.
Cost: $180–$280/m² supplied and installed, depending on board grade and site access.
Perth-specific note: The natural oils in Merbau can leach tannin stains onto concrete or pavers during the first few months. Plan your install sequence accordingly or seal adjacent surfaces.

Spotted Gum

Best for: Contemporary builds, architect-designed homes, coastal properties.
Durability: Class 1 hardwood. Handles high UV exposure without significant fading. Resists splitting better than Merbau in very dry climates.
BAL rating: BAL-12.5 and BAL-19 options available.
Appearance: Pale honey to mid-brown with subtle wavy grain. Develops a silver-grey patina if left unoiled — some owners prefer this weathered look.
Cost: $200–$320/m² supplied and installed. Premium grade boards with minimal gum veins sit at the upper end.
Perth-specific note: Spotted Gum’s tight grain structure makes it less prone to cupping in Perth’s dry summers compared to wider-grained hardwoods.

Treated Pine (H3/H4)

Best for: Budget-conscious renovations, rental properties, decks that will be painted or stained.
Durability: H3 treatment for above-ground use, H4 for ground contact. Expected lifespan 15–25 years depending on maintenance.
BAL rating: Not suitable for BAL zones without additional fire-retardant treatment.
Appearance: Light greenish tint from CCA treatment fades to grey if left unstained. Accepts paint and stain readily.
Cost: $120–$180/m² supplied and installed. The most cost-effective solid timber option.
Perth-specific note: Treated pine expands and contracts more than hardwoods in Perth’s temperature swings. Wider gap spacing (6–8mm) is essential to prevent board buckling.

All three species work for Perth conditions, but your choice hinges on budget, bushfire requirements, and how hands-on you want to be with deck oiling. Merbau and Spotted Gum keep their structural integrity with annual oiling. Treated pine needs repainting every 3–5 years to stay presentable.

What Sets Carpenter-Built Timber Decks Apart

Hand-selected boards, proper joist spacing, and fasteners that won't rust out in five years. The details most deck builders skip.

Board Selection On-Site

Every hardwood board gets checked for cupping, splits, and moisture content before it’s fixed. Reject-grade timber doesn’t make it onto your deck.

Stainless Steel Fixings

Galvanised screws corrode in Perth’s coastal air and leave rust stains on hardwood. We use 316 stainless steel — costs more, lasts the life of the deck.

Expansion Gap Discipline

Hardwood boards expand and contract with Perth’s temperature swings. Gap spacing follows the timber species and board width — not guesswork.

Sub-Frame Engineering

Joist centres at 450mm for hardwood, bearer sizing calculated for the deck span and load. The frame underneath determines whether your deck stays flat or develops a sag in year three.

Drainage Strategy

Fall direction away from the house, gaps between boards sized to prevent leaf buildup, and clearance underneath for airflow. Water that can’t drain causes rot.

Get Your Timber Deck Quote

Tell us your deck size, preferred timber species, and site location. We’ll provide a detailed quote with material specifications and realistic timelines.

Fast Quote →

Timber Deck Builds — Before & After

After: Madora Bay alfresco deck — Merbau boards with pergola frame
Before: Madora Bay alfresco deck — Merbau boards with pergola frame
Before After

Madora Bay alfresco deck — Merbau boards with pergola frame

After: Covered patio deck — hardwood floorboards with brick feature wall
Before: Covered patio deck — hardwood floorboards with brick feature wall
Before After

Covered patio deck — hardwood floorboards with brick feature wall

Timber backyard deck with covered pergola and plants

Perth-Specific Timber Deck Considerations

Perth’s climate isn’t kind to outdoor timber. Summer UV is among the highest in Australia, coastal suburbs get salt-laden air, and the dry heat cycles cause more expansion-contraction movement than most eastern-states builders are used to. A deck specification that works in Melbourne doesn’t always translate here.

UV Degradation and Oiling Frequency

Unprotected hardwood exposed to Perth sun loses its natural oils within 6–12 months. The surface goes grey, the timber becomes more porous, and moisture penetration increases. Annual deck oiling is the minimum for keeping Merbau and Spotted Gum in good condition — twice yearly if the deck is north-facing or fully exposed.

Treated pine fades faster and needs a penetrating stain or paint system within the first year. Without it, surface checking (small splits) becomes noticeable by year two.

Coastal Corrosion and Fastener Choice

Within 5km of the coast, standard galvanised screws will rust. The timber tannins in Merbau accelerate this. By year three, you’ll see black streaking around every screw head, and by year five the screws lose holding strength.

316-grade stainless steel costs roughly 40% more than galvanised but eliminates this failure mode entirely. It’s a cost you pay once, not every time the deck needs refastening.

Ground Clearance and Termite Risk

Hardwood decking is termite-resistant but the softwood framing underneath isn’t. Perth’s northern suburbs have active termite zones year-round. Minimum 400mm clearance between ground and the underside of bearers is standard — more if the site has poor drainage.

H4-treated pine bearers are the minimum spec for ground-level framing. Some sites require a concrete pier system to keep all timber elevated and inspectable.

Fire Risk in Bushfire-Prone Zones

Suburbs with BAL-12.5 or higher ratings (parts of the Hills, some coastal escarpments, and inland areas) have strict requirements. Merbau meets BAL-12.5 without additional treatment. Spotted Gum can be specified for BAL-19. Treated pine doesn’t qualify for either without specialised fire-retardant treatment that adds $50+/m² to the material cost.

Check your property’s BAL rating before locking in a timber species — it’s easier to spec the right material upfront than retrofit compliance later.

timber deck overlooking pool

A Typical Timber Decking Installation Process

Every deck starts with a site assessment and finishes with a handover walk-through. Here’s what happens in between, and the realistic timeline for each phase.

Phase 1: Site Measure and Design (1–2 site visits)

We measure the area, check levels, identify any fall direction requirements, and discuss your timber preference. If the deck connects to the house, we inspect the wall framing type to confirm ledger board attachment will be secure.

You’ll get a quote with material specifications, joist spacing, and indicative installation duration. If council approval or engineering certification is required (raised decks over 1m height, or sites in bushfire zones), we flag that upfront.

Phase 2: Material Ordering and Delivery (1–2 weeks lead time)

Merbau and Spotted Gum aren’t stocked in large volumes at every timber yard. We order your boards, check them on delivery for quality, and reject any out-of-spec lengths before they leave the supplier.

Boards acclimatise on-site for 3–7 days before installation. This reduces post-install movement caused by moisture content differences between the yard and your backyard.

Phase 3: Sub-Frame Installation (2–5 days depending on deck size)

Footings or piers go in first, then bearers and joists. Joist centres are set to 450mm for hardwood decking (400mm for treated pine). We check square and level at every stage — a twisted sub-frame produces a wavy deck surface that’s unfixable once the boards are down.

Ledger boards get bolted through the wall framing into the house structure, not just surface-fixed to brick veneer. This phase determines the deck’s long-term stability.

Phase 4: Decking Board Installation (2–4 days)

Boards go down one at a time, with each one checked for straightness before fixing. Stainless steel screws are pre-drilled to prevent splitting, especially near board ends. Gap spacing is set according to the timber species and board width — typically 4–6mm for hardwood.

Any feature cuts (stair stringers, corner mitres, perimeter trims) happen during this phase. We don’t leave cut-offs for you to deal with — all offcuts and packaging leave with us.

Phase 5: Final Inspection and Handover (1 day)

We walk the deck with you, check for any sharp edges or screw heads that need re-setting, and confirm drainage is working as planned. You’ll receive care instructions specific to your timber species, including recommended oiling frequency and product types.

If your deck needs council sign-off, we organise the inspection booking and provide any required compliance documentation.

Realistic Total Timeline

A standard 25–40m² deck takes 7–14 working days from site measure to handover, including material lead time. Larger decks (60m²+), multi-level designs, or sites with difficult access add time. Weather delays happen — we don’t install hardwood decking in the rain because moisture affects screw torque and board spacing.

Indicative Timber Decking Installation Costs

Timber decking costs vary based on species, deck size, site access, and whether additional work like stairs or balustrades is required. The figures below are indicative — your actual quote depends on your specific site conditions and material choices.

Cost Breakdown by Timber Species (Per Square Metre, Supplied & Installed)

  • Treated Pine (H3/H4): $120–$180/m²
  • Merbau: $180–$280/m²
  • Spotted Gum: $200–$320/m²

What Drives Cost to the Higher End

  • Premium-grade boards: Select-grade Spotted Gum with minimal gum veins and tight grain costs $40–60/m² more than standard grade.
  • Difficult site access: If materials need to be carried through the house or over fences, labour time increases.
  • Complex layouts: Decks with multiple levels, angled corners, or integrated planters require more cutting and fitting.
  • Elevated deck height: Decks over 1m above ground need deeper footings, additional bracing, and sometimes engineering certification — all of which add to the frame cost.
  • Stair and balustrade requirements: A basic 3-tread stair adds $800–$1,200. Balustrades range from $180/linear metre (treated pine) to $400+/lm (stainless steel cable or glass).

What’s Included in These Rates

  • All timber materials (decking boards, bearers, joists, blocking)
  • Stainless steel fixings (screws or hidden fasteners)
  • Sub-frame installation including footings/piers
  • Waste removal and site cleanup

What’s NOT Included

  • Initial deck oiling or staining (adds $15–$25/m² if requested)
  • Removal of existing deck or paving (quoted separately based on scope)
  • Electrical work for deck lighting
  • Council fees or engineering reports (if required)

Example Deck Costs

  • 20m² Merbau deck, ground-level, no stairs: $3,600–$5,600
  • 35m² Spotted Gum deck, raised 600mm, with 3-tread stairs: $8,000–$12,000
  • 50m² treated pine deck, multi-level with balustrade: $9,000–$14,000

These are indicative ranges only. Tell us your deck dimensions, preferred timber, and site specifics, and we’ll provide a detailed fixed-price quote.

Why Choose Breezebay Carpentry for Timber Decking

Not a deck franchise. Not a crew of labourers supervised remotely. A qualified carpenter who's been building decks in Perth for over 27 years.

Trade-Qualified

Licenced carpenter (lic 9005265). Not a handyman, not a deck installer who picked it up on the job.

Hand-Crafted Finish

Every board checked, every cut precise, every screw countersunk. Built to a standard we’re comfortable having you inspect in daylight.

Fixed Pricing

The quote you get is the price you pay. No provisional sums, no surprise extras halfway through.

Perth-Based

We live in Secret Harbour and work across Perth’s southern suburbs to Mandurah (smaller projects) and Perth’s northern suburbs for larger jobs.

Covered timber deck patio in suburban backyard

Is Timber Decking Right for You?

Timber decking isn’t the right choice for every property or every owner. Here’s when it makes sense, and when you should consider alternatives.

Timber Works Well For:

  • Traditional home renovators who want authentic materials that match the home’s era and style.
  • Bushfire-prone suburbs where BAL-rated decking is required and Merbau or Spotted Gum meet the standard without additional cost.
  • Investment properties targeting premium buyers — the finish signals quality in a way composite doesn’t.
  • Owners comfortable with annual maintenance — if you’re happy oiling the deck once a year, hardwood timber stays looking good for decades.
  • Coastal properties with proper clearance — elevated decks with good airflow underneath handle salt air better than ground-level installs.

When Composite Might Be a Better Fit:

  • Rental properties with hands-off landlords — tenants won’t maintain the deck, and composite doesn’t need oiling.
  • Decks that get zero sun — shaded areas stay damp longer, and composite boards don’t absorb moisture like timber does.
  • Owners who dislike maintenance entirely — if annual oiling sounds like too much work, composite avoids that obligation.
  • Decks subject to heavy furniture drag or commercial use — composite resists surface scratching better than softwood (though hardwood still performs well).

The Honest Trade-Off:

Timber decking requires more upkeep than composite but delivers an authentic finish that composite can’t replicate. If the look and feel of real hardwood boards matter to you (or your buyer demographic), timber is worth the maintenance commitment. If you’d rather hose it off once a year and forget about it, composite makes more sense.

We build both. The right choice depends on your property, your budget, and how hands-on you want to be. Tell us your situation and we’ll recommend the option that fits — not the one that’s easier to sell.

Timber Decking FAQs

With annual oiling and basic care, a Merbau deck lasts 40+ years in Perth conditions. The timber itself is highly durable — most failures come from poor sub-frame design or corroded fixings, not the boards themselves. Use stainless steel screws and maintain the oiling schedule, and you’ll get decades of service.

Depends on the deck height and proximity to boundaries. In most Perth councils, ground-level decks under 500mm high and set back from the boundary don’t need approval. Raised decks over 1m, or decks within setback zones, usually do. If your property is in a bushfire zone (BAL-12.5 or higher), approval is required regardless of height. We check your site’s requirements during the quote stage and handle the paperwork if needed.

Merbau is a red hardwood with natural oils that resist moisture and termites. It’s slightly softer than Spotted Gum, which makes it easier to work with but also more prone to surface denting if you drop heavy objects on it. Spotted Gum is paler, harder, and resists splitting better in dry climates. Both are Class 1 hardwoods suitable for Perth, so the choice usually comes down to colour preference and budget — Spotted Gum typically costs $20–40/m² more.

Yes, but it requires a raised sub-frame system — either adjustable pedestals or a sleeper grid. You can’t fix timber boards directly to concrete because they need airflow underneath to prevent moisture buildup. The slab also needs proper fall for drainage. We assess the slab condition during the site measure and confirm whether it’s suitable or whether prep work is needed first. More detail on this: installing decking over concrete.

Indicative rates: $120–$180/m² for treated pine, $180–$280/m² for Merbau, $200–$320/m² for Spotted Gum (all supplied and installed). Final cost depends on deck size, site access, whether stairs or balustrades are needed, and board grade. A standard 30m² Merbau deck with basic stairs typically lands in the $6,000–$9,000 range. We provide fixed-price quotes after the site measure.

Hardwood decking (Merbau, Spotted Gum) needs annual oiling to maintain colour and moisture resistance. Expect to spend 3–5 hours per year on a 30m² deck, using a penetrating decking oil applied with a roller or brush. Treated pine needs either re-staining or re-painting every 3–5 years, which takes longer. Between oil cycles, just sweep off leaves and hose down any spills. Timber that stays clean and oiled lasts the longest.

Galvanised screws corrode in Perth’s coastal air and react with the tannins in hardwood, causing rust stains and loss of holding strength within 3–5 years. Stainless steel (316 grade) costs about 40% more upfront but eliminates this failure mode entirely. For a deck you’re expecting to last 30+ years, it’s a cost you pay once. We use stainless as standard — it’s not an optional upgrade.

Yes. Merbau meets BAL-12.5 requirements without additional treatment. Spotted Gum can be specified for BAL-19. Treated pine doesn’t qualify for either BAL rating unless it’s been treated with a specialised fire retardant, which significantly increases the cost. If your property has a BAL rating, tell us during the quote stage — we’ll specify the right timber for compliance.

Ready for a Timber Deck Built to Last?

Ready for a Timber Deck Built to Last?

Tell us your deck size, preferred timber species, and site location. We'll provide a detailed quote with material specifications and realistic timelines.